Garage 3 temporary shutdown (upper levels)
As part of the ongoing campuswide garage structural repair project, a traffic coating is being applied to the up and down ramps in Garage 3. This requires levels 2-5 to be closed in this facility from Monday, March 25 through Sunday, March 31.
All spaces on Level 1 and the surrounding parking lots remain open. The timing of this repair was planned to coincide with the majority of the student population being away for spring break.
Parking Enforcement Officers are in the area to direct students/staff to the approved overflow parking location in Staff Garage 2. See the map below for reference.